Complete Ventilation Solutions (CVS) partnered with Air Trade Centre in 2021 to deliver an advanced ventilation system for The Hillingdon Hospital in London. This project focused on installing highly efficient Air Handling Units (AHUs) and Heat Recovery Units designed to meet the hospital’s specific airflow and environmental control needs.
Partner: Air Trade Centre
Location: The Hillingdon Hospital, London, UK
Year: 2021
Project Type: AHU with Cross-Flow Heat Exchanger & Compact Heat Recovery Unit with Counter-Flow Heat Exchanger
Air Volume: Up to 12,500 m³/h
Compliance: ErP 2016 & 2018, Eurovent, HTM Compliant
The installation involved both AHUs with Cross-Flow Heat Exchangers and Compact Heat Recovery Units equipped with Counter-Flow Heat Exchangers. These systems were designed to manage air volumes of up to 12,500 m³/h, ensuring consistent and efficient air quality control across various hospital departments. Meeting HTM compliance standards was critical to ensuring the ventilation system supported the hospital’s operational and regulatory requirements.
The complex hospital environment required tailored solutions to accommodate different airflow demands while maintaining HTM compliance. CVS’s team worked meticulously to ensure the units operated efficiently, integrating them seamlessly within the facility’s infrastructure. Adhering to ErP 2016 & 2018 standards and Eurovent certification was vital in delivering a sustainable and compliant system.
The installation provided The Hillingdon Hospital with a highly effective ventilation solution, improving air quality while optimising energy efficiency. The combination of Cross-Flow and Counter-Flow Heat Exchangers allowed for maximum heat recovery, reducing energy waste and supporting the hospital’s sustainability goals.