AHU Installation in Royal Marsden Hospital – 2021

The Project:

In 2021, Complete Ventilation Solutions (CVS) collaborated with Air Trade Centre to install a state-of-the-art Air Handling Unit (AHU) with a Rotary Wheel at the Royal Marsden Hospital in London. This project reinforced CVS’s commitment to delivering tailored ventilation solutions for healthcare facilities with stringent environmental and compliance requirements.

Client: Air Trade Centre

Location: Royal Marsden Hospital, London, UK

Year: 2021 

Project Type: AHU with Rotary Wheel

Air Volume: Up to 2,000 m³/h

Compliance: ErP 2016 & 2018, Eurovent, HTM Compliant

Project Scope for AHU Installation

The AHU was specifically designed to manage air volumes of up to 2,000 m³/h, ensuring efficient airflow and precise environmental control within the hospital. The Rotary Wheel technology provided advanced heat recovery capabilities, enhancing energy efficiency while maintaining consistent air quality. Adhering to HTM standards was critical to ensuring suitability for the hospital environment.

Technical Challenges

The hospital setting demanded a meticulous approach to ensure minimal disruption during installation. CVS’s team expertly integrated the AHU into the facility’s existing infrastructure, meeting the specific airflow demands while strictly following ErP 2016 & 2018 standards and Eurovent certification guidelines.

Results and Benefits

The Royal Marsden Hospital benefited from improved air quality and significant energy savings following the installation. The Rotary Wheel’s high-efficiency heat recovery capabilities reduced energy wastage, contributing to the hospital’s sustainability efforts while delivering a reliable and compliant ventilation system.