Complete Ventilation Solutions (CVS) partnered with Air Trade Centre in 2021 to install a high-performance Air Handling Unit (AHU) with a Rotary Wheel at the Royal Liverpool University Dental Hospital. This project focused on enhancing ventilation efficiency while ensuring compliance with HTM healthcare regulations.
Partner: Air Trade Centre
Location: Royal Liverpool University Dental Hospital, Liverpool, UK
Year: 2021
Project Type: AHU with Rotary Wheel
Air Volume: Up to 11,500 m³/h
Compliance: ErP 2016 & 2018, Eurovent, HTM Compliant
The installed AHU was designed to handle air volumes of up to 11,500 m³/h, providing a controlled and energy-efficient airflow solution for the hospital. The Rotary Wheel technology enabled advanced heat recovery, reducing energy consumption while maintaining optimal indoor air quality. Given the hospital’s specialist medical environment, the system was configured to meet the stringent air quality and hygiene requirements necessary for dental care settings.
The project required careful planning to ensure minimal disruption to hospital operations. CVS’s experienced team coordinated the installation to integrate the AHU seamlessly into the existing ventilation infrastructure. With full compliance to HTM standards, ErP 2016 & 2018 regulations, and Eurovent certification, the system was designed to deliver long-term performance and sustainability.
The newly installed AHU significantly improved air circulation and quality within the hospital, contributing to a safer and more efficient healthcare environment. The Rotary Wheel’s high-efficiency heat recovery capability ensured reduced energy waste while supporting the hospital’s sustainability initiatives.