The Project:

Complete Ventilation Solutions (CVS) recently partnered with Air Trade Centre to install a high-efficiency Air Handling Unit (AHU) at a commercial facility in Milton Keynes. This project marked a key development in CVS‘s ongoing relationship with Air Trade Centre, furthering their shared commitment to providing energy-efficient ventilation solutions. 

Partner: Air Trade Centre 

Location: Milton Keynes, UK 

Year: 2023 

Project Type: AHU with Counter-Flow Heat Exchanger 

Air Volume: 2,000 m³/h to 5,000 m³/h 

Compliance: ErP 2016 & 2018, compliant Eurovent certified

Project Scope Milton Keynes AHU Installation

The core of this project involved the installation of an AHU with a Counter-Flow Heat Exchanger. The unit was designed to manage air volumes between 2,000 m³/h and 5,000 m³/h, ensuring optimal air distribution and climate control throughout the facility. The system was selected based on its compliance with the latest ErP 2016 & 2018 regulations, ensuring high energy efficiency, and was fully certified to meet Eurovent standards, which are critical in health and commercial environments.

Technical Challenges

Due to the varying air volume demands in different parts of the facility, precision in the installation was vital. CVS's expert team worked closely with the Air Trade Centre to ensure the system operated effectively across the required range, from 2,000 m³/h up to 5,000 m³/h, without compromising on performance or energy consumption.

Results and Benefits

The installation successfully improved the facility's indoor air quality while significantly reducing energy consumption. Thanks to the Counter-Flow Heat Exchanger, the system achieved optimal heat recovery, helping the client lower operational costs while maintaining a comfortable environment for occupants.