Skip to main content

CompleteVentSolutions

The Project:

In 2021, Complete Ventilation Solutions (CVS) partnered with Air Trade Centre to deliver a high-efficiency Air Handling Unit (AHU) for Lister Hospital in Hertford. This project focused on enhancing the hospital’s air quality while maintaining strict compliance with HTM standards required for healthcare facilities.

Client: Air Trade Centre

Location: Lister Hospital, Hertford, UK

Year: 2021 

Project Type: AHU with Cross-Flow Heat Exchanger

Air Volume: Up to 5,500 m³/h

Compliance: ErP 2016 & 2018, Eurovent, HTM Compliant

Project Scope for AHU Installation

The installed AHU with a Cross-Flow Heat Exchanger was designed to handle air volumes of up to 5,500 m³/h. This advanced system ensured optimal airflow and efficient heat recovery, reducing energy consumption without compromising performance. The HTM-compliant design was tailored to meet the stringent environmental requirements of a hospital setting.

Technical Challenges

Lister Hospital’s varying departmental airflow needs posed unique challenges. CVS’s experienced team implemented a seamless installation plan, ensuring the AHU met the precise demands of each area while adhering to ErP 2016 & 2018 standards and Eurovent certification.

Results and Benefits

The project delivered significant improvements in air quality and energy efficiency for Lister Hospital. The Cross-Flow Heat Exchanger effectively recovered heat, minimising energy wastage and contributing to the hospital’s sustainability goals.