In 2021, Complete Ventilation Solutions (CVS) partnered with Air Trade Centre to install a high-performance Air Handling Unit (AHU) with a Mixing Box at a facility in Irvine, Scotland. The project focused on improving ventilation efficiency while maintaining reliable air quality control across the building.
Partner: Air Trade Centre
Location: Irvine, Scotland, UK
Year: 2021
Project Type: AHU with Mixing Box
Air Volume: Up to 14,500 m³/h
Compliance: ErP 2016 & 2018, Eurovent
The installed AHU was designed to manage air volumes of up to 14,500 m³/h, delivering consistent airflow and environmental control. The Mixing Box configuration allowed the system to efficiently combine fresh and recirculated air, helping to maintain stable indoor conditions while improving overall energy efficiency.
The project required careful integration of the AHU within the existing ventilation infrastructure. CVS’s experienced team ensured the installation was completed efficiently and met the requirements of ErP 2016 & 2018 regulations and Eurovent certification, ensuring long-term reliability and performance.
The completed installation provided improved air distribution, enhanced indoor air quality, and greater energy efficiency for the facility. With the addition of the Mixing Box system, the building now benefits from a more balanced and adaptable ventilation solution.