In 2023, Complete Ventilation Solutions (CVS) partnered with Air Trade Centre to install a tailored ventilation system at the newly developed Forest of Dean Hospital in Cinderford. Designed specifically for healthcare use, the solution provided enhanced air quality, energy efficiency, and full compliance with HTM regulations.
Partner: Air Trade Centre
Location: Forest of Dean Hospital, Cinderford, UK
Year: 2023
Project Type: AHU with Cross-Flow Heat Exchanger
Air Volume: From 2,000 m³/h to 10,000 m³/h
Compliance: ErP 2016 & 2018, Eurovent, HTM Compliant
The project involved the installation of an AHU with a Cross-Flow Heat Exchanger, engineered to handle air volumes between 2,000 m³/h and 10,000 m³/h. This flexible range allowed the system to meet the varied airflow demands of different departments across the hospital. The Cross-Flow Heat Exchanger enabled effective heat recovery, ensuring reduced energy use and a comfortable indoor climate.
Delivering this installation within a live healthcare construction site required a careful and coordinated approach. CVS ensured all work adhered to ErP 2016 & 2018 requirements, Eurovent certification, and strict HTM compliance, critical for hospital ventilation systems.
The completed system delivered improved airflow control, better indoor air quality, and lower energy consumption across the hospital. With the Cross-Flow Heat Exchanger in place, the hospital now benefits from a more sustainable, high-performance ventilation solution tailored to the needs of patients and staff.