Skip to main content

CompleteVentSolutions

Eastbourne District General Hospital AHU Installation

The Project:

In 2024, Complete Ventilation Solutions (CVS) partnered with Air Trade Centre to
install a high-capacity Air Handling Unit (AHU) featuring a Counter-Flow Heat
Exchanger at Eastbourne District General Hospital. The installation formed part of the
hospital’s wider commitment to improving ventilation performance and energy
efficiency in clinical environments.

Client: Air Trade Centre

Location: Eastbourne, UK

Year: 2024

Project Type: AHU with Counter-Flow Heat Exchanger

Air Volume: From 7,200 m³/h to 16,000 m³/h

Compliance: ErP 2016 & 2018, Eurovent, HTM Compliant

Project Scope

The system was designed to handle air volumes ranging from 7,200 m³/h to 16,000 m³/h, ensuring effective and reliable airflow across multiple hospital departments. The Counter-Flow Heat Exchanger provided excellent heat recovery efficiency, helping the facility maintain stable indoor air conditions while significantly reducing energy consumption

Technical Challenges

As the hospital remained operational during the project, CVS coordinated installation carefully to avoid disruption to critical services. The team ensured full HTM compliance, alongside adherence to ErP 2016 & 2018 standards and Eurovent certification, guaranteeing the system’s performance, safety, and sustainabilit

Results and Benefits

The newly installed AHU has greatly improved air quality and energy efficiency throughout Eastbourne District General Hospital. Its advanced heat recovery technology has reduced operational costs, while maintaining the high standards of ventilation required for healthcare settings