In 2022, Complete Ventilation Solutions (CVS) collaborated with Air Trade Centre to deliver a high-capacity Air Handling Unit (AHU) installation at Derriford Hospital in Plymouth. Designed to meet the demanding requirements of a modern healthcare facility, this HTM-compliant solution focused on delivering energy-efficient ventilation while maintaining precise airflow control.
Partner: Air Trade Centre
Location: Derriford Hospital, Plymouth, UK
Year: 2022
Project Type: AHU with Counter-Flow Heat Exchanger
Air Volume: From 6,000 m³/h to 20,000 m³/h
Compliance: ErP 2016 & 2018, Eurovent, HTM Compliant
The installed AHU featured a Counter-Flow Heat Exchanger and was capable of handling air volumes from 6,000 m³/h up to 20,000 m³/h. This range allowed the system to provide reliable ventilation across a wide variety of hospital departments. The Counter-Flow design was chosen for its excellent heat recovery performance, helping to reduce energy usage while ensuring optimal indoor air quality.
As with all healthcare environments, careful coordination was essential to ensure a smooth and disruption-free installation. The CVS team worked to integrate the system with minimal impact on hospital operations, maintaining strict compliance with HTM standards as well as ErP 2016 & 2018 regulations and Eurovent certification.
The result was a robust, energy-efficient ventilation system that significantly improved airflow and environmental control within Derriford Hospital. The high-performance Counter-Flow Heat Exchanger supported substantial heat recovery, contributing to reduced operational costs and a more sustainable healthcare facility.